BUILDINGS

Work with our team make changes to your buildings or add new locations

To make changes to your buildings and plans in gospace, you can work with our team to have updates made, including changes to furniture layouts and adding new buildings and locations. If you need to add or make changes to any of your floorplans, get in touch with us at [email protected].


Definitions

Replacement vs. adjustment of floorplans

  • Replacement: substituting an entirely new floorplan for an existing floor. Exterior perimeter is generally the same. By default, there is no mapping between the original workpoints/floor, meaning that allocations on the replaced floor with not be preserved in existing scenarios.

  • Adjustment: changing workpoints that are allocated and mapping the new workpoints, so that allocations are preserved in existing scenarios. If workpoints are deleted, the number of workpoints allocated to a group will decrease. If workpoints are moved and the layout has changed and we are maintaining allocations, you will need to specify which new workpoints belong to groups.

    • If adjustments are made to secondary settings or additional furniture, no mapping between workpoints is required and scenario allocations are preserved as a default.


SLAs

  • Minor amendments are generally completed within 24 hours

  • With more extensive amendments (i.e., large percentages of the workpoints have changed and need to be re-mapped, or a floor is replaced) we will advise on timeframes dependent on complexity of requirements.

Last updated